Manual [2021] — Thyssenkrupp Levant Stair Lift Installation

Installing a thyssenkrupp Levant stairlift typically involves securing the rail directly to the stairs and mounting the battery-powered carriage. While professional installation is highly recommended for safety, this guide outlines the standard procedures found in technical documentation. 1. Preparation & Tools

Staircase Audit: Confirm the stairs are a straight single flight with a constant gradient.

Electrical Check: Locate a standard 220/240V wall socket near the top or bottom for the transformer.

Required Tools: You will typically need a power drill with masonry or wood bits, a socket set, a level, and a measuring tape. 2. Rail Installation

Placement: Position the aluminum rail sections on the stairs, usually on the side opposite the handrail.

Jointing: Slide the jointing clamps into the rail grooves to connect sections, ensuring they are evenly spaced and tightened.

Anchoring: Secure the rail legs directly to the stair treads using appropriate screws. The rail must be firmly anchored to support the lift and user weight. 3. Carriage & Seat Assembly thyssenkrupp levant stair lift installation manual

Mounting the Carriage: Slide the main drive unit (carriage) onto the rack-and-pinion rail system.

Seat Attachment: Fix the chair to the carriage, ensuring the swivel handle is properly engaged.

Safety Sensors: Verify that the anti-crush sensors on the carriage and footrest are unobstructed and operational. 4. Electrical Setup

Transformer Connection: Plug the transformer into a wall socket and connect it to the charging contacts at the top or bottom stop places.

Battery Check: Ensure the two 12V dry batteries (forming a 24V system) are properly seated and connected.

RF Equipment: Install and sync the wireless call-and-send stations at the top and bottom landings. 5. Testing & Safety Verification Levant stairlift User Manual - ThyssenKrupp Access - YUMPU ⚠️ Important safety note: This guide is for

The ThyssenKrupp Levant stair lift is a robust, straight-rail mobility solution designed for ease of installation and user-friendly operation. While professional installation by factory-trained technicians is recommended to ensure safety and maintain warranty coverage, understanding the Levant installation process can help homeowners prepare for the setup. Pre-Installation Requirements

Before starting the installation, ensure the staircase meets the following technical specifications:

Staircase Type: The Levant is designed exclusively for straight single flights of stairs with a constant gradient.

Minimum Width: Typically, straight stairlifts require a minimum staircase width of 28 inches.

Inclination Limits: The rail supports an inclination between 28° and 53°.

Power Source: A standard 220/240V (or 110V depending on region) wall outlet is required nearby to power the battery charger. black to negative.

Clearance: Ensure at least 18" to 20" of clearing distance at the bottom of the stairs for safe parking and boarding. Key Installation Steps

The Levant is designed for "non-invasive" installation, meaning it attaches to the stairs rather than the wall.

Stair lift installation and Space Requirements For Your Home

This is a useful guide for installing a ThyssenKrupp Levant stairlift (commonly sold under the ThyssenKrupp Access brand, now part of TK Home Solutions).

⚠️ Important safety note: This guide is for reference only.
Stairlift installation involves electrical work, heavy components, and precise track alignment. ThyssenKrupp strongly recommends professional installation by a certified technician. Improper installation can cause injury, damage, or void the warranty.


5. Electrical & Battery Setup

ThyssenKrupp Levant uses a battery-powered carriage with an onboard charger.

Do not plug in the charger until the carriage is fully on the rail.


1. Pre-Installation Requirements

4. Electrical & Programming

3. Step-by-Step Installation Summary (Straight Rail Version)

The manual organizes installation into 7 logical phases. Below is a paraphrased, actionable walkthrough based on the official document.

Phase 3: Installing the Carriage (Motor Unit)