Feature Name: Solar Feasibility Application Portal

Option 1: Via the KSEB Soura Portal (Recommended)

  1. Go to the official KSEB Soura portal: soura.kseb.in
  2. Click on "Applicant Login/Registration" (You don't need to login just to see the form).
  3. Look for the menu icon (three lines) or a section labeled "Downloads" / "Forms."
  4. Click on "Application for Feasibility Study" or "Feasibility Report Application."
  5. The PDF will open in a new tab. Click the Save/Download icon (usually a floppy disk or downward arrow).

Section B: Electrical Installation Details

What is the KSEB Solar Feasibility Application Form?

The KSEB Solar Feasibility Application Form (often referred to as the Net Metering Feasibility Application) is an official document that a consumer must submit to their respective KSEB section office. The purpose of this form is to:

  1. Initiate the technical assessment of your electrical installation.
  2. Determine the maximum solar capacity (kW/kVA) your existing transformer and service line can support.
  3. Obtain a "Feasibility Report" – a no-objection certificate allowing you to proceed with installation.

Without an approved feasibility study, KSEB will not approve the subsequent "Gross/Net Metering Agreement" or grant grid synchronization permission. kseb solar feasibility application form download pdf


Why Do You Need This Form?

Without submitting this form, KSEB will not begin any evaluation. It is the gateway document for: Feature Name: Solar Feasibility Application Portal Option 1:

Note: Even if you plan to install a small 1 kW system, you still need feasibility clearance. Go to the official KSEB Soura portal: soura


What Happens After Submission? (Feasibility Timeline)

| Step | Time Frame | Action by KSEB | |------|------------|----------------| | 1. Application Receipt | Day 1 | Entry into online portal | | 2. Site Visit | Within 7 working days | Engineer inspects roof & transformer | | 3. Feasibility Report | Within 15 days | Approval or rejection with reasons | | 4. Clearance Letter Issued | Within 21 days | Sent via SMS / post to your address |

If approved, the clearance is valid for 12 months. You must complete installation and apply for net metering within this period.